Everyone who makes molds knows that single-piece production is a characteristic of the mold industry. When designing and cutting, there are multiple pieces of parts with the same specification in the parts list. For example, for inserts, multiple pieces need to be processed due to different installation positions, so the number in the parts list is multiple. There is no problem in requisitioning and purchasing the quantities together, but during the processing process, it is hoped that multiple process cards (processing orders) will be split, and the manager hopes to be able to track each insert, so what should the system do?
Before upgrading T-ONE, the consultant will tell you to either split the number of parts lists and create multiple rows, or split the number of process cards. The system also provides many ways to split the number of process cards:
1. When creating a process card, you can directly modify the quantity of the process card master table.
2. During the process of process card production, the quantity can also be split. It can be split in the process card; it can be split in the parts progress pre-scheduling.
You can also split multiple schedules instead of splitting the process card. The system provides the function of splitting multiple schedules in the parts scheduling electronic dashboard.
In short, there are still many places to split, and after the process card is split, the machine hours and labor hours of the split process card will be automatically recalculated.
After upgrading to T-ONE,I was surprised to find that the generation and quantity splitting of purchase requisitions and process cards are fully automated!
Fangtian's new system has introduced two very important functions: "automatic process and automatic purchase requisition". These functions can greatly reduce the work of designers. When placing material orders (parts list operations), purchase requisitions, process cards, etc. can be automatically generated according to the "control type". Most importantly, it also allows users to choose whether to split multiple process cards according to the "processing quantity" of the parts list, which maximizes the industry feature of the Fangtian system's "single-piece production".
Let's briefly list the functions:
1. After the parts list is reviewed or "Automatic Purchase" or "Automatic Process" is clicked at the bottom of the parts list, the system automatically generates a purchase requisition and process card, without the need for tedious operations by subsequent process personnel.
2. When automatically generating process cards, the process template can be automatically matched according to the "engineering drawing number", and the machine working hours and manual working hours can be automatically calculated in the same proportion according to the process quantity.
3. When automatically generating a process card, you can automatically split the processing quantity of the parts list according to the part progress pre-scheduling attribute 3, the parts list operation attribute 1, attribute 3, etc., and automatically generate a process card with a quantity of 1.
4. When docking with automation software, a parts list operation API interface is provided to automatically accept the BOM table thrown by the automation software, and automatically generate the process card synchronously without manual intervention.
5. The "Automatic Process" at the bottom of the parts list also allows users to choose whether to copy the process cards of all corresponding parts of the "Copy Mold".
6. The sales order operation "Convert to Parts List" will simultaneously generate the parts list 000 original product and the process card and its sub-list process corresponding to the original product.
......
The powerful functions of Fangtian T-ONE system, "automatic purchase" and "automatic process", make the new system more in line with the production characteristics of "molds, mold bases, precision parts, and non-standard industries."